TEL:+86 379 65155558

News

Reprocessing of Mining Tailings with UHMWPE Pipe

Reprocessing of Mining Tailings with UHMWPE Pipe

Historically, mining processes with poor recovery rates have resulted in tailings with significant amounts of recoverable material. The extraction of this material can be achieved using dredges. There are several factors that justify the extraction a...

Nigeria Customer Visited Factory and Prefered to HDPE Pipe

Nigeria Customer Visited Factory and Prefered to HDPE Pipe

Nigeria customer visited our factory and expressed his intention to coopperate with our company to establish ajoint venture in Nigeria. The venture will manufacture hdpe pipe for dredging .Nigeria has a vast market of hdpe pipefor dredging, dreding p...

More Dredging and Dumping (Australia) Approved

More Dredging and Dumping (Australia) Approved

The Australian Marine Conservation Society (AMCS) has expressed extreme concern with the decision by the Great Barrier Reef Marine Park to re-issue a permit to allow dredging of 82,500 cubic meters and dumping of 378,000 cubic meters of dredge spoil...

USA: Kalama Port Closes Bids for Maintenance Dredging

USA: Kalama Port Closes Bids for Maintenance Dredging

Maintenance Dredging The Port of Kalama has received two bids on the TEMCO Maintenance Dredging Project. The apparent low bidder is HME Construction with a bid of $732,000.000 plus sales tax. The bids will be presented to the Port of Kalama Board of...

Slovenia: Koper Dredging Project in full swing

Slovenia: Koper Dredging Project in full swing

The Port of Koper dredging scheme is moving forward. The second, larger dredger, owned by the Netherlands-based contractor Van Oord, yesterday commenced dredging works aimed at the seabed deepening along the Container Terminal to 14 metres. By the en...

Slovenia: Koper Dredging Project in full swing

Slovenia: Koper Dredging Project in full swing

The Port of Koper dredging scheme is moving forward. The second, larger dredger, owned by the Netherlands-based contractor Van Oord, yesterday commenced dredging works aimed at the seabed deepening along the Container Terminal to 14 metres. By the en...

Copyright © Luoyang Guorun New Material Technology Co.,Ltd. Moible:+86 15090186906 Clare Tsui,Email:kirk0123@foxmail.com